Change packages follow a life cycle, starting from the creation of it, up to the installation of it into production (and optionally followed by a backout it needed). That's the theory, and also what happens most of the time.
However consider some change package that was created by some ChangeMan ZMF user, whereas such package is not yet installed in production (not BAS yet). What happens with such package if the ChangeMan ZMF user quits the company (variation: moves on to another job within the company)?
READ MORE